Context
- A350 Pointe Avant perimeter (A350 critical path)
- Securing group objectives
Objectives :
Identify areas for improvement to reduce on-site lead time by 20%.
Mission
1- Mapping the existing situation (VSM)
2- Valuing the entire VSM (Lead time, VA/NVA)
3- Identifying the fundamental causes of variability
4- Drawing up a 5-year transformation map
Project features
Sector: Aeronautics
Expertise: Quality and Continuous Improvement
Location : St Nazaire (44)